www.hartron.org

 
 
   HOME
   ACHIEVEMENTS
   CUSTOMER CARE
   DATA PROCESSING
   FRANCHISE

   FUTURE PLANS
   INFORMATION TECHNOLOGY
   TRAINING

   INFRASTRUCTURE DEVELOPMENT
   MARKETING
   QUERY ABOUT RATES
   RESEARCH & DEVELOPMENT
   DEPLOYMENT
   HARYANA CSC SCHEME
   SETC
   AMC VENDORS
  TENDERS
   QUERY ABOUT HARTRON
   RTI ACT. 2005
    DEPARTMENT FOR IT (DIT)
   HARTRON EMAIL
    
RATE CONTRACT OF COMPUTER SYSTEMS AND ADD ON ITEMS VALID UPTO 30.09.2010.
#
ITEM
DELL MAKE
HCL MAKE
For Ex-stock delivery please see note
HP MAKE
1. Intel Core 2 Duo  E7500 Processor with Windows 7 Prof. Operating System
Detailed specification with Annexure I
 31750/-*
(Optiplex 380)
 27500.00
(Pro/Tru BL 1330)
 31850.00
(Pro 3090)
2. Intel Core 2 Duo  E7500 Processor with Windows Starter Operating System
Detailed specification with Annexure II
 28500/-*
(Optiplex 380)
 23500.00
(Pro/Tru BL 1330)
 28300.00
(Pro 3090)
3. Intel Core 2 Quad Q8400 Processor with Windows 7 Prof. Operating System
Detailed specification with Annexure III
 37980/-*
(Optiplex 780)
 33000.00
(Pro/Tru SL 1300)
 39000.00
(Elite 8000)

* 8% rebate will be applicable for Education & Research Departments having custom duty exemption certificate under Government of India Notification no. 10/97 etc.

NOTE :- Purchase orders of urgent nature on piece meal basis upto the maximum quantity of 10 Computers of HCL make in a single order may be placed with M/s Radha Trading Company SCO 93-94 (Basement), Sector 17-B, Chandigarh, Tel. No 0172-3048001, 3047502, 4670386 M - 09317770006 by paying VAT extra on R/C price. Installation and after sale support for such orders shall be carried out by M/s HCL. This has been done with the concurrence of M/s HCL and approval of competent authority.

Optional items with Computer System:-

# ITEM DELL MAKE HCL MAKE
HP MAKE
1.

Additional 2 GB DDR-III RAM(1066 MHz)

2350/-

2350/-

2350/-
2.

Amplified Speaker and Mike (OME Make)

Optional In-built Speaker
In-built Speaker in Monitor
250/-
3.

Graphics Card with 512 MB RAM

1900/-

1900/-

1900/-
4.

Graphics Card with 1 GB RAM

2600/-

2600/-

2600/-

RATE CONTRACT OF COMPUTER SERVER VALID UPTO 30.11.2010.

# ITEM UNIT PRICE (Rs.) MAKE
Vendor
1.

HP ML 150 G6 Server
2 x Intel Xeon Quad Core E5504 Processor (2.0 GHz or higher) with Intel 5500 or better Chipset, 8 GB ECC DDR III @1066/1333 MHz or higher RAM

Detailed specification with Annexure IV

1,08,000.00

HP

HCL Infosystems Limited


THE VENDORS & MAKES EMPANELLED FOR COMPUTER SYSTEMS AT PRESENT ARE AS FOLLOWS

SR. NO.

VENDOR

MAKE

CONTACT PERSON & PHONE

1.
M/s Electro Photo Equipments Pvt. Ltd.
SCO 111-113, Sector - 17 B, Chandigarh
DELL

Mr. Pawan Behal - 9814027744
Tel No: 0172-2721764, 3044123, 5087709, 5085862 FAX/Tel:2706895
pawanbehal@electophoto.in, electrophotolimited@gmail.com

2.
M/s HCL Infosystems Limited
SCO 66-67, Sector -17 B, Chandigarh
HCL
Sh. Om Jiwan Gupta - 9780011576
Ph. 0172-2709781
email:- omjiwang@hcl.in

3.

Spectra Computech Pvt. Ltd. 
SCO 2923-24, 2nd Floor, Sector - 22 C, Chandigarh

HP

Mr. Sandeep Vig - 9814003024
Tel No:
0172-5025419, 5025425
Sandeep_vig@spectracomputech.com

Annexure-I

Intel Core 2 Duo (E7500) Processor with Windows 7 Prof. OS

SPECIFICATIONS
ITEM
DESCRIPTION

Processor

Speed

Cache

FSB

Chipset

Mother Board

Memory

Hard disk Drive

Keyboard

Expansion Slots

Housing

Video Graphics

I/O Interface

Ports

Power Supply

Sound Card

OS Supported

Storage Bays

Mouse

Monitor

Optical Drive

Ethernet Card

Preloaded Software

Certification

Other items

Intel Core 2 Duo E7500 or higher

2.93 GHz or Higher Core 2 Duo CPU

3 MB  L2 Cache @ Core Speed of CPU

1066 MHz FSB or higher

Intel 4 series Chipset or better(Intel only)

Original Intel or OEM manufactured

2 GB DDR-III RAM (1066 MHz) or higher

320 GB SATA (7200 RPM)

USB 107 keys Standard keyboard

Minimum 1 PCI & 1 PCI Express x16 (Total 3 slots either of the combination).

Micro ATX Cabinet

Integrated Graphics with Free slot for additional Graphics card

Dual Channel serial  ATA-150 controller

6 USB Ports atleast 2 USB Ports at front side.

Suitable power supply to meet the requirement of additional devices (Power efficiency>=85%)

Integrated    

Window XP/ Vista/Windows 7 / Linux

Minimum two External 13.35cm (5.25")  and one Internal 8.90 cm (3.5)

Optical mouse with Pad

18.5" TFT (Wide Screen) or higher TCO 03 Certification

16X Internal DVD Writer

10/100/1000 MBPS

Windows 7 Professional with Media and recovery partition down gradable to windows XP Prof.

ISO 9001/9002, Energy star 5.0 Compliant, FCC, UL,CE

Set of Dust Covers of good quality for the complete system


Annexure-II

Intel Core 2 Duo (E7500) Processor with Windows Starter OS

SPECIFICATIONS
ITEM
DESCRIPTION

Processor

Speed

Cache

FSB

Chipset

Mother Board

Memory

Hard disk Drive

Keyboard

Expansion Slots

Housing

Video Graphics

I/O Interface

Ports

Power Supply

Sound Card

OS Supported

Storage Bays

Mouse

Monitor

Optical Drive

Ethernet Card

Preloaded Software

Certification

Other items

Intel Core 2 Duo E7500 or higher

2.93 GHz or Higher Core 2 Duo CPU

3 MB  L2 Cache @ Core Speed of CPU

1066 MHz FSB or higher

Intel 4 series Chipset or better(Intel only)

Original Intel or OEM manufactured

2 GB DDR-III RAM (1066 MHz) or higher

320 GB SATA (7200 RPM)

USB 107 keys Standard keyboard

Minimum 1 PCI & 1 PCI Express x16 (Total 3 slots either of the combination).

Micro ATX Cabinet

Integrated Graphics with Free slot for additional Graphics card

Dual Channel serial  ATA-150 controller

6 USB Ports atleast 2 USB Ports at front side.

Suitable power supply to meet the requirement of additional devices (Power efficiency>=85%)

Integrated    

Window XP/ Vista/Windows 7 / Linux

Minimum two External 13.35cm (5.25") and one Internal 8.90 cm (3.5)

Optical mouse with Pad

18.5" TFT (Wide Screen) or higher TCO 03 Certification

16X Internal DVD Writer

10/100/1000 MBPS

Windows Starter with media.

ISO 9001/9002, Energy star 5.0 Compliant, FCC, UL,CE

Set of Dust Covers of good quality for the complete system


Annexure-III

Intel Core 2 Quad (Q8400) Processor with Windows 7 Prof. OS

SPECIFICATIONS
ITEM
DESCRIPTION

Processor

Speed

Cache

FSB

Chipset

Mother Board

Memory

Hard disk Drive

Keyboard

Expansion Slots

Housing

Video Graphics

I/O Interface

Ports

Power Supply

Sound Card

OS Supported

Storage Bays

Mouse

Monitor

Optical Drive

Ethernet Card

Preloaded Software



Certification

Other items

Intel Core 2 Quad Q8400 or higher

2.66 GHz or Higher Core 2 Quad CPU

4 MB  L2 Cache @ Core Speed of CPU

1333 MHz FSB or higher

Intel Q45 series Chipset or better(Intel only)

Original Intel or OEM manufactured

4 GB DDR-III RAM (1066 MHz) or higher

320 GB SATA (7200 RPM)

USB 107 keys Standard keyboard

Minimum 1 PCI & 1 PCI Express x16 (Total 3 slots either of the combination).

Small Form Factor (SFF) Cabinet with volume <=16 Liters

Integrated Graphics with Free slot for additional Graphics card

Dual Channel serial  ATA-150 controller

1PS2 /USB Key board Port, 1PS2/USB Mouse Port, 6 USB Port atleast 2 USB Ports at front side.

Suitable power supply to meet the requirement of additional devices (Power efficiency>=85%) with Active power factor Correction.

Integrated  Internal Speaker on Motherboard/ TFT/ Headphone (Creative / Logitech) 

Window XP/ Vista/Windows 7 / Linux

Minimum one External 13.35cm (5.25")  & one 8.90 cm (3.5";)

Optical mouse with Pad

18.5" TFT (Wide Screen) or higher TCO 03 Certification

16X Internal DVD Writer

10/100/1000 MBPS

Windows 7 Professional with Media and recovery partition down gradable to windows XP Prof., Anti Virus Software with 60 days validity.

ISO 9001/9002, Energy star 5.0 Compliant, FCC, UL,CE

Set of Dust Covers of good quality for the complete system

Annexure-IV

HP ML 150 G6 Server

SPECIFICATIONS
ITEM
DESCRIPTION

Processor

Speed

Cache

FSB

Chipset

Mother Board

Memory

Hard disk Drive

RAID

Keyboard

Expansion Slots

Housing


Cabinet

Video Graphics
Ports

Power Supply


OS Supported

Mouse

Monitor

Optical Drive

Ethernet Card


Preloaded Software


Certification

Warranty

2* Intel Xeon Quad Core E5504 or higher

2.00 GHz or Higher XEON Quad Core

4 MB L3 Cache 800 MHz Qpi Bus

1333 MHz FSB or higher

Intel 5500 or better on Intel or Equivalent OEM

Original Intel or OEM manufactured

8 GB ECC DDR-III @1066/1333 MHz or higher RAM expandable upto 32 GB

4 x146 GB 15K Hot-Swap 3.5" SAS HDD's/10K Hot Swap 2.5" HDD

8 port SAS RAID Controller with 256 MB Cache (RAID 0,1,5 Support)

USB 104 keys Standard Keyboard

5 PCI/PCI Express

Small Form Factor (SFF) Cabinet with volume <=16 Liters

Tower


Integrated Graphics to support VGA and above resolution 4 USB & 1 Serial port


Redundant power supply (Hot Swap) with Cooling option to meet the requirement of additional devices


Window Server 2008/ Linux

Optical mouse with Pad

18.5" TFT (Wide Screen) or higher TCO 03 Certification

16X Internal DVD Writer

Dual LAN (10/100/1000) Network Card with asset feature tracking and security management, remote wake up

Server Management Software


ISO 9001/9002 , FCC, UL, Windows, Red hat

3 Years Comprehensive on-site

Mode of Purchase:-
The Indenting Departments/Organizations shall be at liberty to either place the orders through HARTRON or directly with the vendors at the rate contracts recommended above. In case the orders are placed through HARTRON, the Corporation would be responsible for inspections and delivery and charge the agency charges, as applicable, over and above the contracted prices. In case of direct orders, the HARTRON agency charges would not be payable but the responsibility for inspections and delivery would rest with the indenting Departments/Organizations. In case where the Departments/Organizations decide to place the orders through HARTRON during the period of rate contract, the MD HARTRON would also seed the preference of brands/makes from HODs/Secretaries of such indenting departments and place the orders accordingly. Wherever, the indenting department did not indicate any preference, the orders would be placed for the HCL make computer systems, which is available at the lowest price.

Terms and conditions:-
1. Price: The total F.O.R. destination prices mentioned in Purchase Order are inclusive of current excise duty, freight, insurance, Sales Tax etc. No change in any other duties, including Sales Tax, Custom Duties, effect due to devaluation of Rupee shall be entertained.

2. Configuration: Systems matching the configuration and sub assemblies (model and make) of the system offered for evaluation will only be accepted for testing.  

3. Service support: Supplier will depute a maintenance and service support team with spare parts (at no cost of Govt.) for each block of 100 computer/servers to provide prompt service during the warranty period and AMC period, if awarded.

4.
Pre-delivery inspection: Before taking delivery, every system will be inspected and tested. Computer/server systems will be subject to bench marking test (WIN bench/AMI-DIAGS) and also continuous run test for a period of 72 hrs. These tests will be carried out at vendor’s premises at vendor’s cost. It is a responsibility of the vendor to make necessary testing facility available at his place. The tested systems shall be sealed for delivery. Supplier shall inform to HARTRON at least Seven days in advance for pre-inspection.

5. Identification Mark:  Every system should have identification mark and the identification mark No. will be provided by HARTRON after the successful inspection of the respective product.

6.
Packing:  All goods should be packed properly to avoid breakage and pilferage in transit.

7. Packing List: Packing list  is to be provided with the delivery challan.

8.
Transit Insurance: The supplier has the responsibility to get the transit insurance at his own cost.

9.
Rejection:  All goods to be supplied which are not as per specification or are not of standard quality are liable to be rejected and returned to you at your own risk and cost.  In case any of the material supplied by you is rejected and is lying stored with us, the same shall be at your own risk.

10.
Payment Terms:  90% on inspection and delivery.  Balance 10% payment will be made after satisfactory  installation and on submission of 10%  bank guarantee valid for a period of 37 months (warranty period + one month) + the period of AMC to the extent availed. Bank guarantee shall be retained by HARTRON. 10%  Bank Guarantee will be released after completion of period of warranty and the period of AMC, as applicable. In case user Department does not opt for AMC, bank guarantee will be released after completion of warranty period of three years. Bank Guarantee to be obtained for order value of more than Rs. 3 Lac.

11.
Preventive Maintenance:- The vendor will visit the computer installation site at least once in a year for preventive maintenance (cleaning etc.) during warranty & AMC period even if no complaint lodged by the purchaser/user department. The Bank Guarantee of 10% of total order value submitted by Computer vendors for a period of 37 months will be released by HARTRON only after verifying adherence to the preventive maintenance reports and call reports in respect of the Computer Systems supplied. The purchasing Departments/organizations shall maintain logs/registers wherein the service visits (both preventive and call services) would be recorded. HARTRON would issue detailed guidelines on the subject to the purchasing Departments/ Organizations.

12.
Delivery Period:  Within 4 weeks  from the date of issue/receipt of supply order. The time taken for the inspection upto 7 days will not be included in the delivery period (applicable for inspection at supplier premises).

13.
Penalty Clause: The date of delivery stipulated in supply is deemed to be essence of the contract and in case the contractor fails to deliver any assignment within the period prescribed for such delivery stipulated in supply order, the delayed consignment will be subject to 2% penalty per consignment per week recoverable on the value of stores supplied. In case of non-payment by the contractor, recovery will be made from his bills or amount of earnest money with HARTRON.

14.
Risk Purchase: On the failure of the supplier to make supply within the extended period or otherwise on the receipt of such information in the office of HARTRON, risk purchase at the cost of supplier will be made by HARTRON within 6 months of the expiry of the stipulated delivery period by inviting short term quotations from the registered and other known suppliers. The excess cost thus incurred will be recovered from the supplier from his pending bills/earnest money or through court of law.

15.
Undertaking of Rates:- All the three vendors have given an undertaking that the rates offered to GoH/ HARTRON were the lowest possible for this purchase of Computers and Rate Contract for a period of 6 months. They have confirmed that they had not offered these rates or lower rates to any other Govt. Departments/ Organizations. However, in case, it is established that they or their principal has offered lower rates through any dealer for similar model and quantity, terms and during the same period, they would be liable to pay the differential amount to HARTRON. .

16.
Warranty Period:  The warranty of complete system, including software support, would be 3 years from the date of installation.  Warranty will cover repair/replacement of all defective parts, if any, with the same or equivalent make for any part replaced. Software media will not be covered under warranty period, but it will be replaced by the supplier against any manufacturing defects. The maintenance of systems supplied will be provided on site. Limited/ carry-in warranty will not be accepted. The supplier will provide after-sale service during the warranty period from Chandigarh or from the nearest place of installation site. The supplier will complete the service call within one working day for Chandigarh/Panchkula, within two working days for other District Headquarters and within 3 working days for the remaining locations, failing which, penalty shall be levied @ 1% per working day for totally down system and @ 0.5% per working day for partially down systems of the annual warranty amount. The annual warranty amount shall be deemed to be @ 10% of the initial cost price.

17 .
Cancellation of order:
(a) If the order is not executed, as specified there in or in accordance with the written delivery schedule furnished by us, for satisfactory performance of this order, we reserve the right to cancel this order, without liability.
(b) Any loss incurred for non-execution of this order, will have to be borne by you and the same shall be recovered from you.

18. Acceptance Certificate:  On successful commissioning, indenting organizations will issue an acceptance certificate.

19.
Responsibilities: It will be responsibility of the vendor to keep the system in good working condition so as to ensure a minimum of 95% uptime on monthly basis by carrying out the necessary repairs/maintenance of computer/server systems otherwise it will be treated as a non-performance, on part of the vendor for which performance guarantee may be forfeited and may be debarred for future business. The vendor shall provide free replacements of equivalent parts as and when required, excluding printer ribbons, toners, tapes and floppy media. Warranty period shall be applicable from the date of successful installation.

20.
Installation:
(a) The vendor will install the complete system (hardware and software) at the premises decided by HARTRON 220V +/-10% AC source; 50 Hz +/- 1Hz shall be made available at site by the user.
(b) The wiring diagrams and panels required for the system installation shall be given by the vendor in advance. User Department/Organization shall make available the necessary wiring and panels at the installation site.
(c) Full details of space requirement with dimensions should be given in advance.
(d) Also specify other details, which are essential/necessary for computer/server functioning.

21.
Training: The vendor shall provide operational training on the operating system and other related software purchased.

22. Documentation:  Documentation of system software, library routines etc. must be provided along with the detailed operating instructions.  The documents supplied must be neat, concise and readable.  They should be original, licensed copies.  The documentation of the hardware should also be provided which covers the maping and other tunable parameters.

23. Reinstallation: If the need arises the computer/server supplier shall reinstall the said computer/server system at a new site without any additional charges. The agreement shall stand valid for 5 years.  However, packing forwarding and insurance charges for shifting the system at new site will be borne by the user organization.

24.
AMC Period: The Annual Maintenance Contract (AMC) beyond the warranty period of three years is at the sole discretion of the purchasing department, which may be availed for a maximum period of up to 3 years after the warranty period. Wherever, the purchasing department wishes to avail of the AMC for whatever period (subject to a max. of 3 years), the same would be available @5% of the total hardware cost. AMC will cover all parts except software media. Service clause for the AMC shall be similar to warranty conditions. Penalty shall be levied @1% per working day for totally down system and @0.5% per working day for partly down system of the AMC amount. The penalty amount will not exceed the total AMC amount.

25.
Details of after-sale support and response time.
(a) M/s HCL have accepted that  minimum two company engineers at each districts will be appointed  to take care of after sale-support. Response time for district Head Quarter would be the same business day closer and outstation beyond city limits as the next business day closer. In addition, the list of their direct support offices across the state along with escalation matrix placed at Annexure-A.
(b) M/s Dell will provide services directly through their service provider after call is registered at their call center on phone/e-mail and diagnoses is done on-line same time. The engineer will visit next business day with parts The support & escalation matrix is placed at Annexure-B. M/s Electro Photo has accepted that they have service coordinator at Hisar, Gurgaon, Rohtak, Karnal,Panchkula and Chandigarh for helping customers get Dell Support.
(c)M/s HP India, through M/s Spectra Computech have accepted that response time of 6 hours is applicable in case of systems installed within 30 kms of support centers (at Gurgaon, Karnal, Panipat, Ambala, Hisar, Faridabad, Rohtak & Kurukshetra) and the next business day for all other places. The list of service centers along with  escalation matrix placed at Annexure-C.

26.
Billing:
(a) With every dispatch of goods or materials under the contract, invoices in triplicate will be prepared by the contractor.  Invoices in duplicate are to be sent by the contractor to the indenting department, the duplicate to be returned by the indenting department with the quantities or number received duly noted thereon and the third copy to be sent by the contractor to Asstt. General Manager (Mkt.), HARTRON for record in his office.
(b) The bill /Challan should clearly mention our purchase order no. & date, dispatch particulars & date, description of stores which should be in accordance with the description given in the purchase order, item no., reference, as given in the P.O. etc.
(c) In case material is to be sent by Road, 2 copies of the invoices must be sent through the carriers for purpose of octroi check and for checking by sales tax authorities.
(d) Advance copy of Challan & Invoice must be sent directly to consignee.
(e) Each item should bear identification mark i.e. purchase order no. & S.no. 

27. Location: Location of installation of each department where the systems are to be installed will be provided by HARTRON at the time of inspection.
 
28. Alternative Models: It might happen during the Rate Contract period that existing processor may not be available due phasing out of production by the manufacturer-suppliers. In such a situation, the supplier would supply the upgrade model at the same or lesser price. MD, HARTRON would be competent to accept higher models at the same or lesser price during the Rate Contract period.

29.
Arbitration Clause: In the eventuality of any dispute, the sole arbitrator shall be Commissioner, Information Technology, (CIT), Haryana and his decision shall be binding on the concerned parties.

30.
Augmentation:  The supplier shall have to guarantee for a minimum period of 5 years from the date of acceptance that the system shall be upgraded to the latest version or some additional systems at their negotiated prices. (if any).

31.
Jurisdiction: All disputes will be settled within the jurisdiction of Chandigarh.

-- BACK --
Updated &  Posted on 07.06.2010


Nutzungsbedingungen


HARYANA STATE ELECTRONICS DEVELOPMENT CORPORATION LIMITED
A STATE GOVERNMENT UNDERTAKING

SCO-111-113, SECTOR 17-B, CHANDIGARH -160017 (INDIA)
EMAIL- HARTRON@HARTRON.ORG